TPE干燥与烘料要求?注塑压力大,飞边压不住

应用领域 发布时间: 2026-09-13 3138 阅读

As soon as it's powered on, the mold is full and the edges fly; repairing the edges continues until dark. The material hasn't been dried through, and no matter how high the injection molding pressure is, it can't be controlled.

The flash cannot be controlled; it's not that the mold clamping is insufficient, but that the material is not dry.

TPE drying and baking: both temperature and duration need to be right—temperature, time, and moisture content. Conclusion first: if moisture gets into the material, silver streaks and bubbles appear together—the moisture content is the passing line for drying the material.

The biggest pitfall of drying TPE before feeding: high injection pressure makes it impossible to control flash. Moisture enters the material, and flash with silver streaks appears together — moisture content is the pass line for drying.

TPE drying is a process task: only when the moisture content meets the standard will the molding be stable. When the process is correct, the yield will be stable—it's a process job, don't skip steps.

Moisture is the source of flash, so why remove the water first?

TPE absorbs moisture quickly, and moisture is the source of flash silver streaks. Including drying tests in the process—if not dried, there will be problems.

The drying temperature is determined according to the grade: SEBS base 60-80℃. The drying time is determined according to the thickness: 2-4 hours.

Drying material is not just a formality: moisture content must be measured for acceptance. Only when the moisture is below 0.1% can it enter the hopper—moisture content is the passing line for drying material.

How to match injection pressure, holding pressure, and flash

Injection molding pressure: High pressure fills well, excessive pressure causes flash. Adjust the pressure according to the part — pressure is the throttle for filling.

Holding pressure: compensate shrinkage during holding pressure, excessive holding pressure stress. Holding pressure is adjusted item by item—holding pressure is the stabilizer of dimensions.

Flash: Check the clamping force and moisture content for flash. If the clamping force is insufficient, the flash cannot be pressed down—clamping force is the gate of the flash.

Drying parameters, clearly compared in one table

systemTemperatureTime
SEBS-based60-80℃2-4 hours
TPV70-90℃2-4 hours
TPU80-100℃3-4 hours
TPEE90-110℃3-5 hours

Table reading: The baking methods for SEBS base and filled materials are different, and the temperature and duration are arranged according to each system—if the moisture content does not meet the standard, adjusting the machine also cannot suppress the defects.

Bake according to the system, only then will the moisture be completely removed.

No burrs when starting up, first check these four items

ProjectRequirementJudgment
Moisture content<0.1%Meet the standard
TemperatureAccording to the systemMeet the standard
TimeBy thicknessMeet the standard
clamping forceBy pieceMeet the standard

How to read the table: Measure the drying temperature, time, and moisture content item by item, discharge the damp air completely before loading machine—the dryness of the material determines the subsequent yield.

Moisture content is the passing line for drying materials.

If the drying material is done directly in the barrel, it will foam no matter how tight the mold is.

Pitfall 1: Skipping the drying of material. Using moist material directly for injection molding results in surface silver streaks and shrinkage occurring together—this drying step cannot be compensated for if skipped.

Pitfall 2: Insufficient clamping force. Flash—check the clamping force.

Pitfall three: Not measuring moisture content. Silver pattern — moisture content must be measured.

Moisture content, temperature, time — ask before starting the machine

Three questions: what system, how thick the parts, what clamping force. One check: measured trial mold yield rate—three questions and one check, supplier details are clear.

Drying material verification must be done first: set the temperature and duration according to the resin, and only start the machine when the moisture content meets the standard. Remove the moisture first, then discuss pressure—the moisture content is the pass line for drying materials.

Make sample retention a habit: retain samples from each batch and recheck the moisture content by batch. Before switching materials between batches, compare them first before scaling up—the batch remains stable, and customer complaints are fewer.

Flying edges, missing glue, silver streaks: a table for fault comparison

PhenomenonReasonCountermeasure
Flying edgeHigh moisture contentAdd roasting material
Flying edgeLow clamping forceLocking mold
Silver streakMoistAdd roasting material
Shortage of materialsLow pressureApply pressure
shrinkLow hold pressureIncrease pressure

Only feed materials when the moisture content meets the standard—if drying is inadequate, silver streaks, bubbles, and hydrolysis will occur together. Adjust the temperature of the drying hopper according to the material grade; seal the dried material to prevent moisture, because if it absorbs moisture, all the drying will be wasted.

Write the drying material into the process card: three-step check of temperature, time, and moisture content. Before changing materials, compare the drying window before discussing the price; ensure the hopper is sealed tightly, and do not leave it open after drying.

Drying and then absorbing moisture is equivalent to not drying at all—the problem lies not in the drying equipment, but in the sealing during transportation. The screw should follow the TPE design compression ratio; the injection molding pressure and clamping force should be balanced, otherwise a high pressure will cause flash to escape.

TPE 'afraid of water'—drying the material is her ritual before molding; if the silver streaks are not thoroughly removed, problems arise. The temperature is adjusted according to the grade; moisture content testing is done according to the standard, and only after the data is verified is the machine started.

After the moisture content is properly controlled, continuous production shows no silver streaks. Drying records are archived; personnel operations are consistent, and for similar issues, first check the ledger.

Most TPE itself does not absorb moisture, but if the granules are oil-filled or hygroscopic and absorb water, injection molding will result in splay, sticking to the mold, and surface blemishes.

The drying temperature of the material depends on the grade, generally 60-80°C for two to four hours; after drying, seal it to prevent moisture. Leaving it open for an afternoon is equivalent to drying in vain, and an insulated hopper ensures stability.

Check the moisture content when accepting dried materials, not how long they have been dried. Start the machine only after accurately measuring the moisture content; keep the hopper insulated, and when changing colors or materials, clean the barrel first; keep a sample from each batch to check the appearance, and only increase the production once silver streaks and bubbles have disappeared.

Final inspection of dried material: moisture content, hopper insulation, and color change cleaning of the cylinder are carried out with each batch.

Restart the machine after accurately measuring the moisture content, keep the hopper insulation pipe in good condition, and clean the barrel first when changing color or material; keep a sample from each batch to check for silver streaks and bubbles, and only increase the output once they disappear.

Ultimately, drying the material is about managing three things at once: moisture content, hopper sealing, and barrel cleaning. Set the temperature according to the grade at 60-80℃ and dry for two to four hours. After drying, seal to prevent moisture; measure the moisture content accurately before starting the machine, and clean the barrel first when changing color or material.

Cologne Customer Case: Shrinkage Rate Unstable and Dimensions Fluctuating, Small Batch Trial Production Continues with Three More Orders

An injection molding factory in Chongqing has unstable shrinkage rates for TPE parts, with large dimensional fluctuations. Cologne coordinated small batch trial production for verification before scaling up, achieving stable dimensions, and the customer placed repeat orders for three consecutive batches. During small batch trial production, lock the dimensions before mass production — for dimensional issues, check the drying of the material first, then the parameters.

Summary

The process of drying and heating TPE materials involves removing moisture first, then controlling pressure. If the injection molding pressure is high, flash cannot be controlled, and the moisture content is at the passing line.

For more than ten years, I've focused on just one thing: making nylon usable.

PA6 and PA66 are the basics, PA46, PA6T, and PA9T are the threshold for high temperature resistance, PA11 and PA12 handle water and oil pipelines, and nylon alloys make up for the balance that a single resin can't provide. Modified thermoplastic elastomers, modified nylon, modified PPO, and PPS run in parallel, along with nylon resins, secondary brand materials, and bulk stock from major chemical companies.

Using the same material in the wrong place means accidents. So you ask about the part first, then the material.